Our approach, stage 3 of 6
Site development.The work you never see.
Clearing, grading, drainage, utilities and the driveway.
Why it matters
Nobody admires a footing drain. But whether a basement stays dry, a driveway holds its shape and a lawn drains after a storm is decided here, before the house exists.
Site development turns a piece of land into a place a house can stand. It is heavy, careful work, and it is done once. We would rather spend the time now than revisit it for the life of the home.
What happens
Step by step.In this order.
- 01
Protecting the site
Before machines arrive, we mark the limits of clearing, protect the trees that are staying, and install erosion controls so soil stays on the property.
- 02
Clearing
Only what must go is removed. Mature trees and stone walls are part of what made the site worth buying, and we keep what we can.
- 03
Excavation and grading
The foundation hole is dug and the land is shaped so that water runs away from the house in every direction. Ledge and unsuitable soil are dealt with now, not later.
- 04
Drainage
Footing drains, swales and, where needed, underground systems are installed to carry water away from the foundation and off the site in a controlled way.
- 05
Water and waste
The home is connected to public water and sewer where they exist. Where they do not, the well is drilled and the septic system is installed to the engineer's design.
- 06
Driveway and utilities
The driveway base is built to carry construction traffic first and daily use after. Power and communications are brought in, in trenches where the site allows.
What we hold ourselves to
Three standards.Every home.
- 01
Water always has somewhere to go
Every site is graded and drained so the house sits high and dry.
- 02
Keep what is worth keeping
Trees, walls and natural features are protected, not cleared for convenience.
- 03
Build the base properly
What is buried cannot be easily fixed. It is done right the first time and inspected before it is covered.
Common questions
Askedand answered.
Why does site work take time?
It depends on weather, soil and what is found underground. Rushing it is how drainage problems begin.
Do you keep existing trees?
Wherever we can. Clearing is limited to what the house, driveway and systems actually require.
What if the lot has no public sewer?
A septic system is designed by an engineer for that site's soil and approved by the local health authority before installation.